Tel: +86-182 5553 8313       Email: sales@onaie.cn
You are here: Home / Products / Cone Crusher Parts / Metso / HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly
HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly

loading

HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly
HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly
HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly
HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly
HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly
HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly

HP400 Metal Mining Machine Cone Crusher Replacement Parts Head Assembly

Availability:
Quantity:
  • HP400

  • ONA

  • 847490

Head Assembly, which suit to Metso Nordberg cone crusher. ONA-7090058015
Product Description

Interference fit

1. Use sandpaper to roughen the T-seal installation surface, apply glue and catalyst, and place the seal installation groove;

t seal metso t seal

2. Place the upper head bushing, the lower head bushing, head ball, and the cylindrical pin into a sealable wooden box, and pour in dry ice. Freeze for 4-6 hours. If the ambient temperature is low, increase the amount of dry ice and the freezing time.

upper head bushing lower head bushing

3. Install the frozen cylindrical pin into the head;

head assembly head assy

4. Lift out the frozen head ball, quickly measure the outer diameter, compare it with the size of the head ball installation position to see if it has shrunk, and then install the head ball;

 head ball head ball nordberg head ball hp400

5. Lift out the upper head bushing, quickly measure the outer diameter and compare it with the size of the installation position, lift it to the installation position and install it;

upper head bushing upper head bushing

6. Welding head bushing stopper;

head ball hp400

7. Lift out the frozen lower head bushing, quickly measure the outer diameter and compare it with the size of the installation position, lift it to the installation position and install it;

lower head bushing hp400 lower head bushing nordberg

8. Apply thread glue to the lower head bushing fixing bolt, screw it in and tighten it.

lower cheek plate metso lower head bushing hp400

Click youtube link to see the installation video guide: https://www.youtube.com/watch?v=S1b_3z1WGm0

Previous: 
Next: 
ONA is a enjoy good reputation among our customers for high-quality products, integrity and responsibility

Quick Links

Product Category

Contact Us

 +86-182-5553-8313 
 No. 9 South Dachengfang West Road, Oaks Intelligent Manufacturer Industrial Park, Dangtu District Enconomic Development Zone, Ma'anshan City, Anhui Province
Leave a Message
Contact us
Copyright © 2024 Ma'Anshan ONA Intelligent Equipment Co., Ltd. All Rights Reserved. Support by leadong.comSitemap. Privacy Policy